FACTORS AFFECTING THE EFFICIENCY OF DELIVERING PROJECT CARGO FOR POWER PLANT PROJECTS IN NABIRE: A CASE STUDY AT PT. AGILITY INTERNATIONAL

Maya Tamara Trainor, Nur Maulidah, Muhammad Rifni

Sari


Abstract: This research is focusing on a single project with intention of achieving in-depth understanding on how the handling of the power plant project deviation. This research is focus on the delivering process of heavy lift equipment to Nabire by PT. Agility International. How do PT. Agility International manage deviations happening in this project. The result shows that there is no delay regardless of the project problems and deviation, because of the present Temporary jetty.
Keywords: Project Cargo, Power Plant, Constructions, Deviations and Breakdown, Heavy Lift Equipment, Freight Forwarder


Teks Lengkap:

PDF

Referensi


References

Aragonés-Beltrán, P., Chaparro-González, F., Pastor-Ferrando, J. P., & Pla-Rubio, A. (2014). An AHP (Analytic Hierarchy Process)/ANP (Analytic Network Process)-based multi-criteria decision approach for the selection of solar-thermal power plant investment projects.

Energy, 66, 222–238. https://doi.org/10.1016/j.energy.2013.12.016

Checkland, P.B. (1989) „Soft systems methodology‟, Human Systems Management, Vol. 8, No.4, pp.273–289.

CSCMP (Council for Supply Chain Management Professionals), 2016, CSCMP Supply chain management terms and glossary. Available from http://cscmp.org/imis0/CSCMP/Educate/SCM_Definitions_and_Glossary_of_Terms/C SCMP/Educate/SCM_Definitions_and_Glossary_of_Terms.aspx?hkey=60879588- f65f-4ab5-8c4b-6878815ef921 Accessed on 21 November 2017.

Gimenez-Espin, J. A., Jiménez-Jiménez, D., & Martínez-Costa, M. (2013). Organizational culture for total quality management. Total Quality Management & Business Excellence, 24(5–6), 678–692. https://doi.org/10.1080/14783363.2012.707409

Shan, H., Hu, E., Wang, L., & Liu, G. (2014). Study on antecedent variables of dual commitment in the transitional economy. Pakistan Journal of Statistics, 30(5), 939–955. https://doi.org/10.1007/978-3-662-43871-8

Steyn, J., & Lourens, D. (2017). An Introduction to Project Logistics Management , (May).

Taylor, P., Sobotka, A., & Czarnigowska, A. (2010). Analysis of supply system models for planning construction project logistics, (October 2014), 37–41. https://doi.org/10.1080/13923730.2005.9636335

http://www.jocpr.com/articles/engineering-construction-project-site-logistics-management.pdf Accessed on 15 November 2017

http://www.agility.com/EN/products-and-services/Pages/ProjectLogistics.aspx Accessed on 15 November 2017

Gimenez-Espin, J. A., Jiménez-Jiménez, D., & Martínez-Costa, M. (2013). Organizational culture for total quality management. Total Quality Management & Business Excellence, 24(5–6), 678–692. https://doi.org/10.1080/14783363.2012.707409

Ludvigsen, J., & Klæboe, R. (2014). Extreme weather impacts on freight railways in Europe. Natural Hazards, 70(1), 767–787. https://doi.org/10.1007/s11069-013-0851-3

Mohanty, R. P. (2015). Understanding construction supply chain management for road projects Anand Prakash, 22(4), 414–435.

Muhammadiyah, U., & Majid, S. A. (n.d.). Formulasi Kebijakan Sistem Policy Formulation of Sea, 3(2), 161–183.

Nurlita, L., Sekolah, S., Manajemen, T., Trisakti, T., Made, I., Sekolah, A., … Trisakti, M. T. (2016). Loyalitas Pelanggan Pada Perusahaan Freight Forwarding Customer Loyalty of Freight Forwarding Company, 3(3), 299–308.

Rafi, S., & Rifni, M. (n.d.). SOFT SYSTEMS METHODOLOGY PADA PENGEMBANGAN BANDAR UDARA PROVINSI SULAWESI BARAT SOFT SYSTEM METHODOLOGY-BASED ON DEVELOPMENT OF AIRPORT OF WEST SULAWESI, 4(2), 159–176.

Ricardianto, P. (n.d.). Handling Standard Operating Procedure Export Document Ocean Freight, 2(1).

S, T. I. H. (n.d.). MULTIMODA DALAM MEWUJUDKAN VISI LOGISTIK INDONESIA 2025, 69–84.


Refbacks

  • Saat ini tidak ada refbacks.