PENGARUH JUMLAH BUS SIAP OPERASI DENGAN JUMLAH PENUMPANG DIANGKUT PADA PT. JAKARTA MEGA TRANS
PAYAMAN MANIK, INDRA SUWARLAN
Abstract
PT. Jakarta Mega Trans (PT. JMT) is a TransJakarta bus operator and formed of four
transport companies consortium which are PT. Mayasari Bakti, PT. Steady Safe,
Perum PPD, and PT. BPW Pahala Kencana. This study is aimed to find out and
understand the relationship between the operated buses and the carried passengers.
The method of the study is Spearman Rank correlation analysis and hypothesis test.
Based on the result and analysis, there is a significant relationship between the
operated buses and carried passengers which is ρ = 0.7824. The hypothesis test shown
that ρhitung > ρtabel (0.7824 > 0.777) which support the previous result.
transport companies consortium which are PT. Mayasari Bakti, PT. Steady Safe,
Perum PPD, and PT. BPW Pahala Kencana. This study is aimed to find out and
understand the relationship between the operated buses and the carried passengers.
The method of the study is Spearman Rank correlation analysis and hypothesis test.
Based on the result and analysis, there is a significant relationship between the
operated buses and carried passengers which is ρ = 0.7824. The hypothesis test shown
that ρhitung > ρtabel (0.7824 > 0.777) which support the previous result.