PENYEBAB KETERLAMBATAN KEGIATAN PENGADAAN IMPOR BARANG LOGISTIK HIGH DAMPING RUBBER BEARING
Abstract
PT. Wijaya Karya (Persero) Tbk is a construction company that has 6
subsidiaries and 10 operating departments. In conducting its business, the
company is applying sourcing materials locally and internationally. One of
them is the procurement of goods imported High Damping Rubber Bearings
(HDRB) that serves as the foundation of anti-earthquake building structures
and cannot be produced inside the country. Using a causal diagram (fishbone
diagram; Dr. Kaoru Ishikawa), it was found that the factors causing delays in
goods (HDRB) is due to production machinery, human resources, time, method,
and money
subsidiaries and 10 operating departments. In conducting its business, the
company is applying sourcing materials locally and internationally. One of
them is the procurement of goods imported High Damping Rubber Bearings
(HDRB) that serves as the foundation of anti-earthquake building structures
and cannot be produced inside the country. Using a causal diagram (fishbone
diagram; Dr. Kaoru Ishikawa), it was found that the factors causing delays in
goods (HDRB) is due to production machinery, human resources, time, method,
and money
Keywords
procurement, High Damping Rubber Bearing (HDRB), and fishbone diagram
Full Text:
UntitledRefbacks
- There are currently no refbacks.
View My Stats